Crews made progress in managing the Quilpituk Creek wildfire near Vernon as they carried out a planned ignition operation along the west flank. The operation, conducted on Saturday, aimed to remove approximately 240 hectares of unburnt fuel and strengthen containment efforts (castanet.net).
Firefighters worked to control the blaze, which has grown to cover an estimated 1,139 hectares. The controlled ignition was part of a broader strategy to reduce fuel and prevent the fire from spreading further. Officials reported that the operation was carried out safely and in line with standard wildfire response protocols.
The BC Wildfire Service continues to monitor the situation closely, with additional resources on standby should conditions change. Local residents have been advised to remain alert and follow official updates. No evacuations were necessary at this time, though authorities recommend staying informed through official channels.
The fire remains a priority for emergency responders, with ongoing efforts focused on containment and minimizing environmental impact.





























