Ombudsman Jesus Crispin Remulla criticized the government for not fully controlling flooding in Cebu, citing a P60-billion worth of flood control projects as insufficient. During a visit to the Mananga River flood control project in Talisay City, Remulla expressed concerns over the effectiveness of the infrastructure in mitigating the recent floods (newsinfo.inquirer.net). The flooding, which affected multiple areas, was described as severe, with some communities experiencing significant damage and displacement.

Remulla emphasized that the projects should have prevented the worst impacts of the floods. He called for a thorough review of the implementation and management of the flood control initiatives. The Ombudsman’s office is currently investigating the matter, with investigators accompanying him during the site visit. The incident highlights ongoing challenges in disaster preparedness and infrastructure management in the region.

Sources
  • Inquirer.net — P60-B worth of projects should have controlled Cebu flooding – Remulla
  • Cebu Daily News — Pasil online seller killed by gun-for-hire; suspect detained